Make, architecture firm that holds for the 2012 London Olympic has just showcased a handball arena design. Located at the Olympic Part at Stratford, East London
With the boost of Handball Sports in Beijing (first played in Olympics in 1936). A new low-cost design has been brought in the public for commentary for the long upcoming 2012 Olympics in London.
London Handball Arena has a capacity of 6000 to 7000 seats. The arena is sought to finish in 2011.
The arena is an achievement piece of 'Make' among dRMM, Grimshaw and David Morley Architects.
ODA (Olympic Delivery Authority) claims it as natural and subdued tones on its exterior, banded by a span of glass showcasing a colourful interior.
As per sustainability, water flows came from collected and harness natural lighting atop of it.
image courtesy: source
tribute to: bdonline, wikipedia
Monday, September 1, 2008
London Olympics: Handball Arena Design Opened
Labels: architecture news, london olympics 2012
Posted by psyche at 8:02 PM
Subscribe to:
Post Comments (Atom)
0 comments:
Post a Comment